Skip to content

Z105

Here the model design for Z105, another pressure zone in Aarhus is discussed. This case is interesting, since two water works are connected to this pressure zone, which is difficult to solve for a traditional control strategy. Additionally, is has a quite pronounced challenge with critical flow in the southmost section.

Alt text